RAIL SYSTEM EXPERIENCES OF MESCIOGLU ENGINEERING
IN LAST FIVE YEARS

1. Ankara – Istanbul High Speed Railway Project

1.1. Sincan – Esenkent Section, Design and Construction Supervision and Consultancy Services

   --Controlling, Engineering, Supervision and Consultancy Services of all projects of 15,50 kilometers long double-track high speed railway.
   --Engineering and Consultancy Services Earthworks; 2.570.000 m3 cut, 1.375.000 m3 fill
   --Engineering and Consultancy Services of 360 meters viaduct, a railway bridge, 3 bridges, 15 culverts, 2 vehicle overpasses, 10 vehicle underpasses and 280 meters long tunnel (NATM).
   --Determining, preparing and controlling of the progress payment.

        Contractor
        Cost of Construction
        Administration
: SIGMA Construction Company
: 19.000.000 - EURO
: General Directorate of Turkish Railways (TCDD)

1.2. Ankara (Esenkent) – Eskişehir Section, Design and Construction Supervision and Consultancy Services

   --Controlling, Engineering, Supervision and Consultancy Services of all projects of 200 kilometers long double-track high speed railway.
   --Engineering and Consultancy Services Earthworks; 14.240.000 m3 cut, 10.850.000 m3 fill
   --Engineering and Consultancy Services of 3996 meters viaduct, 2 motorway bridges, 17 bridges, 254 culverts, 27 overpasses, 33 underpasses and 471 meters long tunnel (NATM).
   --Determining, preparing and controlling of the progress payment.

        Contractor
        Cost of Construction
        Administration
: OHL (SPAIN)  – ALARKO Joint Venture
: 650.000.000 - EURO
: General Directorate of Turkish Railways (TCDD)

1.3. Eskişehir – Inönü Section, Design and Construction Supervision and Consultancy Services

   --Controlling, Engineering, Supervision and Consultancy Services of all projects of 22 kilometers long double-track high speed railway.
   --Engineering and Consultancy Services Earthworks; 1.476.000 m3 cut, 1.400.000 m3 fill
   --Engineering and Consultancy Services of 4 vehicle underpasses, 2 vehicle overpasses and drainage systems.
   --Determining, preparing and controlling of the progress payment.

        Contractor
        Cost of Construction
        Administration
: SIGMA Construction Company
: 23.000.000 - EURO
: General Directorate of Turkish Railways (TCDD)


2. Adana Light Rail Transit System Supervision and Consultancy Services

   Adana Light Rail Transit System Project is 14 kilometers long mass transit project, having two major parts as Civil Works and Electromechanical System Works.

2.1. Civil Works
   - Depot Area having the Workshop, Administrative Building, Auxiliary Power building, Auxiliary Building, Vehicle Washing Unit and necessary places for the parking of vehicles.
   - Railway line of 13.460 meters long, Structural Composition:
             3.200 meters cut&cover tunnel,
             1.550 meters retained cut,
             970 meters retained fill,
             4.700 meters R.C viaduct,
             225 meters steel viaduct,
             2.200 meters at-grade line.
   - 13 stations on the railway line, having a total length of 1.100 meters. The structural compositions:
   - Additional 380 meters cut&cover railway structure at the entrance of the Depot Area

2.2. Electromechanical System Works
   - 36 vehicles.
   - Power Supply and Distribution:
             Traction power substations,
             Station power substations,
             Depot area and workshop’s electrical equipment.
   - Lighting and Sockets for stations, depot area and Workshop.
   - Overhead Line System:
             Main line and depot area.
   - Workshop Equipment
   - Communication, Control and Signalization Systems:
             Fiber Optic,
             Radio,
             Public Address,
             Telephone,
             Closed Circuit TV (CCTV),
             Clock, Fire Alarm,
             Signalization,
             Scada and Fair Collection Systems.

        Contractor
        Cost of Construction
        Administration
: ALARKO (Civil), ABB-Adtranz-Bombardier (Electromechanical)
: 260.000.000 - EURO
: Adana Metropolitan Municipality


3. Extension of Existing Konya Tram Line Preliminary Project, Feasibility Study and Design of Application

    Feasibility study of 5 kilometers long double-track light rail transit system has been prepared efficiently and it has been approved by DLH (General Directorate of Construction of Railways, Ports and Airports) approval authority. Application projects have been completed appropriately according to the approved feasibility study. Also, 8 stations and a warehouse project have been designed.



4. Management and Optimization of Railway Maintenance and Renewal Activities with Geomedia and Research

   In MR.GIS solution, in the context of effective and efficient railway transportation, it is intended to create an information based system for track maintenance and renewal (M&R) services. It is possible to build degradation model track geometry by using condition based methods on the base of data gathered on the track. It is possible to prepare maintenance and renewal programs in short and long term by using the degradation model of the track geometry.

   Geographical information systems (GIS) can be used to combine geographical and non-geographical data together and GIS enables the users to follow M&R programs on a visual environment.

   With MR.GIS, you can manage records of;
      - Existing conditional information on railway track layout and engineering structures (including construction information)
      - History of Maintenance and Renewal works
      - Operational Information
      - Measurements
   And also with these information;
      - Degradation model of track geometry
      - M&R planning
      - Optimization of resources
      - Querying and Reporting
can be performed

   MR.GIS solution has been accepted as national advantage by TUBITAK and taken into support context. In addition to presenting a beneficial to our country with our studies, because of being GIS based, our project which is first over the world showed that both our country and our technology has been improved and our competency on railway realized.


References

HIGHWAY DESIGN PROJECTS 977 km
APPLICATION PROJECTS 155.4 km
APPLICATION PROJECTS STRUCTURE 11.260,41 m2
PENDIK MUNICIPALITY APPLICATION PROJECTS 1000 m2
TUNNEL PROJECTS 2903 m.
BRIDGE PROJECTS 45106,11 m2
RAILWAY DESIGN PROJECTS 221 km
SEWERAGE SYSTEM DESIGN WORKS 649.275 m.

WASTE WATER TREATMENT PLANT PROJECT

1 Unit
POTABLE WATER TREATMENT PLANT PROJECT 1 Unit
ASKİ CONSULTANCY SERVICES All infrastructure projects
between 2002-2003
FAST TRAIN RAILWAY CONSULTANCY SERVICES 270 km
ADANA METROPOLITAN MUNICIPALITY SUBWAY CONSULTANCY SERVICES 13 km
BOTAS PETROLEUM PIPELINE CORPORATION
CONSULTANCY SERVICES
3
100
Units
Km.
EXPROPRIATION ENGINEERING PROJECTS 1841 km
HIGHWAY SURVEYS 431 km
SUBWAY SYSTEM SURVEYS 10,3 km
WATER SUPPLY SURVEY PROJECT 1056 km
SEWERAGE SURVEYS 9425 km
URBAN LAND DEVELOPMENT PROJECTS 296,97 ha
FOREST CADASTRE PROJECTS 82500 ha
FOREST ROADS PLANNING 360 km
PHOTOGRAMMETRIC FOREST MAPPING 45000 km2
MAPPING PROJECT 37369 ha
CADASTRAL PROJECTS 44200 Parcel
DIGITAL PHOTOGRAMMETRIC MAP PRODUCTION 149.000 ha
AERIAL TRIANGULATION FIELDWORK 137 km
EIA REPORT 98 km
FEASIBILITY REPORT PREPARATION 1 piece
INFORMATION SYSTEMS PROJECT 16 pieces

TRANSPORTATION PROJECTS

Ankara (Esenkent) - Eskisehir High Speed Railway Section
Design and Construction Supervision and Consultancy Services
Contractor: OHL (SPAIN) - ALARKO Joint Venture
Cost of Construction:  650.000.000 - EURO
Administration: Genaral Directorate of Turkish Railways (TCDD)
Total Km:  206 km
Scope of The Project:
Controlling, Supervision and Consultancy Services of Design Projects,
Controlling and Consultancy of Earthworks: 14.240.000 m3 cut, 10.850.000 m3 fill,
Construction and Design Consultancy of 3993 m Viaduct,
2 Motorway Bridges, 17 River Bridges, 254 Culverts,
26 Overpasses, 30 Underpasses and a 471 m Long Tunnel,
Determining, Preparing and Controlling of The Progress Payment.

Sincan - Esenkent High Speed Railway Section
Construction Supervision and Consultancy Services
Contractor: SIGMA Construction Company
Cost of Construction:  19.000.000 - EURO
Administration: Genaral Directorate of Turkish Railways (TCDD)
Total Km:  15.50 km
Scope of The Project:
Controlling and Consultancy of Earthworks: 2.570.000 m3 cut, 1.375.000 m3 fill,
Construction Consultancy of a 360 m Long Viaduct, 1 Railway and 3 River Bridges, 15 Culverts, 2 Overpasses, 10 Underpasses and a 280 m Long Tunnel (NATM),
Determining, Preparing and Controlling of The Progress Payment.

Eskisehir - Inonu High Speed Railway Section
Construction Supervision and Consultancy Services
Contractor: SIGMA Construction Company
Cost of Construction:  23.000.000 - EURO
Administration: Genaral Directorate of Turkish Railways (TCDD)
Total Km:  26 km
Scope of The Project:
Controlling and Consultancy of Earthworks: 1.476.000 m3 cut, 1.400.000 m3 fill,
Construction Consultancy of 5 Overpasses, 4 Underpasses and Dranaige Systems,
Determining, Preparing and Controlling of The Progress Payment.

Adana Light Rail and Metro Transit System
Supervision and Consultancy Services
Contractor: ALARKO (Civil Works),
ABB - Adtranz - Bombardier (Electromechanical Works)
Cost of Construction:  260.000.000 - EURO
Administration: Adana Metropolitan Municipality
Total Km:  14 km
Scope of The Project:
Controlling and Consultancy of Following Civil Works;
  - Depot Area Having a Workshop, Administrative Building, Auxilliary Power Building, Auxilliary Building, Vehicle Washing Unit,
   
  - 3.200 m Cut and Cover Tunnel,
  - 1.550 m Retained Cut,
  - 970 m Retained Fill,
  - 4.700 m R.C. Viaduct,
  - 225 m Steel Viaduct,
  - 2200 m at-grade line,
  - 13 Stations,
  - Additional 380 m Cut and Cover Railway Structure at The Depot Area.
     
Controlling and Consultancy of Following Electromechanical System Works;
  - 36 Vehicles,  
  - Power Supply and Distribution,  
       - Traction Power Substations  
       - Station Power Substations  
       - Depot Area and Workshop's Electrical Equipment.
  - Lighting and Sockets for Stations, Depot Area and Workshop,
  - Main Line and Depot Area Overhead Line System,
  - Workshop Equipment,    
  - Communication, Control and Signalization Systems.

Extention of Existing Konya Tram Line Preliminary Project
Feasibility Study and Design of Application
Contractor: -
Cost of Construction:  -
Administration: Konya Metropolitan Municipality
Total Km:  5 km
Scope of The Project:
Feasibility study of 5 km of long double - track light rail transit system, which was approved by DLH (General Directorate of Construction of Railways, Ports and Airports), has been prepared,
Application projects have been prepared according to the approved feasibility study,
8 stations and a warehouse project have been designed.

Kulu Junction - Aksaray - Ereğli Junction Highway (Turkey)
Contractor: -
Cost of Construction: -
Administration: Turkish General Directorate of Highways, (2000-2003)
Total Km: 217 km

Scope of The Project:

The project, one of the most important routes in Turkish Highway Network includes;
1/1000 Scale Photogrammetric Map of 5060 Hectares Area,
Detailed Design of 217 Kilometers Long Highwa,
Detailed Design of 61 At-Grade Intersections and 2 Interchanges,
Geological - Geotechnical Survey Works, Pavement Design, Hydrological - Hydraulic Works, Stormwater Drainage Design,
Bill of Quantities as an Attachment of Tender Documents.

Afyon - Bayat - 4th Region Border Highway (Turkey)
Contractor: -
Cost of Construction: -
Administration: Turkish General Directorate of Highways, (2001-2005)
Total Km: 65 km

Scope of The Project:

The project, plays an important role in connecting the east, west and south sides (Mediterranian Sea) of Turkey includes;
Land Surveying,
Detailed Design of 65 Kilometers Long Highway,
Detailed Design of 20 At-Grade Intersections and 2 Interchanges,
Geological - Geotechnical Survey Works, Pavement Design, Hydrological - Hydraulic Works,
Bill of Quantities as an Attachment of Tender Documents.

Bridges, Interchanges and Roads Detailed Design Projects in European Side     (30. Stage) (ISTANBUL)
Contractor: -
Cost of Construction: -
Administration: The Great Municipality in Istanbul
Total Km: -
Scope of The Project:
The project consists of totally 35 junction design, over 250 km. preliminary design and route study. Finally 25 detailed design projects has been completed. More than 20 junctions traffic count, analyze and investigation has been established. For designing and evaluating 157 km road, geotechnical, topographical site surveys and expropriation of necessary are as have been performed.
Project figures:
157 km Preliminary and Detailed Design,
15.000 m2 Viaduct, 15.000 m2 Overbridge, 3.000 m2 Underpass Detailed Projects,
13.000 m2 Reinforced Earth Wall, 53.000m2 Retaining Wall Detailed Projects, 1.000 m2 Hydraulic Structure Projects,
Analyzing, Counting and Simulating of More Than 20 Junction and Crossing Points.

Pendik Kaynarca Neighborhood Under E-5 Underpass with Bazaar Project
Contractor: -
Cost of Construction:  1,781,000 TL
Administration: Pendik Municipality
Total Km:  -
Scope of The Project: Design of underpass with stores for pedestrians in Pendik in Istanbul. This pedestrian underpass is a shopping center with 22 stores.
This project involves electrical, mechanical, architectural and static design and projects.
Underpass has a dimension of  57m length, 18m wideness and totally 1308 square meters closed area.


INFRASTRUCTURE PROJECTS

SEWERAGE PROJECTS
Work Administration Contractor Total Year
Karaman İller Bankası Eryapı Ltd.Şti. 649.275 Km 2000-2001

SEWETAGE TREATMENT PLANT PROJECT
Work Administration Contractor Total Year
Çelikhan (Adıyaman) Başbakanlık Güneydoğu Anadolu Projesi Bölge Kalkınma İdaresi Başkanlığı Kaya Müh. Ltd. Şti. 1 Unit 1996-1999

FRESH WATER TREATMENT PLANT PROJECT
Work Administration Contractor Total Year
Küçükkuyu (Çanakkale) İller Bankası Gen. Müd. Kaya Müh. Ltd. Şti. 1 Unit 1998-2001

FEASIBILITY REPORT PREPARATION
Work Administration Contractor Year
Samsun-Terme Kocaman Grubu (Miliç Irmağı ve Kolları) Taşkın ve Rüsubat Kontrolü Fizibilite Raporu Hazırlanması Hizmet Alımı İşi Dsi VII. Bölge Müdürlüğü  Samsun DSİ VII. Bölge Müdürlüğü  Samsun 2007------


SURVEYING

Kayseri Cadestre Mapping
Details of The Project:

   Job includes 7800 parcels and surrounding areas, inbuilt cadastre plots and/or Map information digitizing, renewing cadastral parcel productivity. GPS and Total Station equipment are used to in the application and preparation of land register sheets.


Konya Cadestre Mapping
Details of The Project:

   Job includes 28400 parcels and surrounding areas, inbuilt cadastre plots and/or Map information digitizing, renewing cadastral parcel productivity. GPS and Total Station equipment are used to in the application and preparation of land register sheets.


Düzce Cadestre Mapping
Details of The Project:

   Job includes 8000 parcels and surrounding areas, inbuilt cadastre plots and/or Map information digitizing, renewing cadastral parcel productivity. GPS and Total Station equipment are used to in the application and preparation of land register sheets.



PHOTOGRAMMETRY

Kulu Digital Photogrammetry Map Production
Details of The Project:

   Digital photogrammetric Map collection of a 217 km long road corridor Flight has been done using a Zeiss RMK Top30 Camera. With a long orthophoto maps has been used to come up with solutions.


Kahramanmaraş Digital Photogrammetry Map Production
Details of The Project:

   A total area of 27000 Ha which are in places residential sections and which are going to be mapped with a scale of 1/1000 and 1/5000,produced as Digital Photogrammetric Maps and Ortho-Photos. Kahramanmaraş Municipality, is using this data for every project as infrastructure (zoning ordinance, transportation plans, urban information system, water and waste water planning, cadastre). Flight has been done using the Zeiss RMK Top30 Camera of which we are the only Authorized Distributor in Turkey


Antalya Digital Photogrammetry Map Production
Details of The Project:

   Within the City Municipality borders, with an area of 102000 Ha has been a project issued for us as a 1/1000 and 1/5000 scale digital photogrammetric map and orthophoto production.  The City  Municipality has done all its investments in infrastructure (Tourism, Transportation, Zoning Ordinance, Urban Information System, etc.). Flight has been done with the Zeiss RMK Top30 Camera which we are the only Authorized Distributor in Turkey.


Bursa Digital Photogrammetry Map Production
Details of The Project:

   The borders includes the City Municipality and near residential areas with a total area of 35000 Ha 1/1000 and 1/5000 digital photogrammetric maps and orthophoto production has been a project issued to us. The City Municipality has done all its investments in infrastructure (Tourism, Transportation, Zoning Ordinance, Urban Information System, etc.). The flight has been done using a Vexcel XP Large Format Digital Camera.



CONSULTANCY SERVICES

     1 - CONSULTANCY SERVICES for ASKİ
   Consultancy Services for all infrastructural projects of The Great Municipality of Ankara; General Directorate of ASKİ with construction cost of 552.538.286.052-TL (2002/1 unit price). Details are below:

ASKİ ROAD, SEWER and RAINWATER PROJECTS
WORK NAME CONTRACTOR İHALE TARİHİ
Altındağ Zübeyde Hanım Mah. PS Kanal İnş. OK Müh. İnş. 26.11.2002
Altındağ Alemdağ Mah. Pissu Kanal İnşaatı T.Fikret Özdemir 14.01.2003
Cebeci Erzurum  Mah. PS/YS İnşaatı Kemhaş 17.07.2002
Cevizlidere-Balgat PS/YS İnşaatı Kocalar İnşaat 24.12.2002
Çankaya GOP. Ve Tunus Havzası PS/YS İnş. METOL 10.01.2003
Anıttepe Mh.PS/YS, Gençlik Cd.PS Kan. İnş YSK 09.01.2003
Akpınar Mah. PS/YS OK Müh. İnş. 09.01.2003
Elvan YS Baskı Kanalizasyon İnşaatı İdeal Yapı İnş. 25.12.2001
Etimesgut Süvari Mh. 1.Cad. PS/YS,
Mamak PS İnşaatı
İlke Boya Kimya 26.11.2002
Etimesgut Süvari Mh. 5.Cad. PS/YS Kan. İnş. Gündüz İnşaat 26.12.2002
Etimesgut Elvan PS/YS Kanalizasyon İnşaatı HONA 14.01.2003
Etimesgut Süvari Mh. 5.Cad. PS / YS RBK 08.01.2003
Haymana Yolu PS Kanalizasyon İnşaatı Soysal Müh. 18.11.2002
Haymana Yolu PS Kanalizasyon İnşaatı KASMET 24.12.2002
Keçiören  Yağmursuyu Topgül İnşaat 09.09.2002
Mamak Araplar Mah.  PS / YS / İçmesuyu Şebeke İnşaatı Öner Kardeşler 25.04.2002
Mamak Peyami Sefa Mh.-Kutlu Mah.-Zeki Doğan Mah.-Altıağaç Mah. Pissu Sema Sağlık 05.09.2002
Mekkeli Deresi-Mertali Deresi-Kusunlar Deresi PS/YS  Kanalizasyon İnşaatı Ulunak 08.01.2003
Yuva Bölgesi Pissu Kanalizasyon İnşaatı Kocalar İnş. 01.11.2002
Ergenekon Mah. Pissu Kanalizasyon İnşaatı Öner Kardeşler 10.01.2003
Ankara Kazan Yolu Yol Genişletme PS/YS ve İçmesuyu İnşaatı Özdoğanlar 06.01.2003
Samsun Yolu Yol Genişletme YP/PS İnşaatı Aslanlar İnşaat 13.06.2002
Konya Yolu Yol Genişletme İnşaatı Ünal Yapı 29.08.2001
Mamak Plevne Cad. YS/PS Aktarım İnşaatı Metehan İnşaat 14.05.2002
Çankaya Beytepe Köyü PS/YS ve Yol İnşaatı Boztaş İnşaat 16.07.2002
Hatip Çayı Dere Islah Yapısı Onarımı ve Atıksu Aktarım İşleri Elif İnşaat 04.06.2002
Gölbaşı- Y.Mah. İlçelerinde Betonarme Boru ile Sürme Metodu Uygulanarak PS ve Bağlantı Hatları İnşaa Edilmesi Nata İnşaat 15.11.2001
Y.Mahalle-Balgat Deresi YS Islahı Asyıldızlar İnşaat 16.05.2002
Y.Mahalle-Dikmen Deresi Islahı, YS İnşaatı Ert İnşaat 10.06.2002
Konya Yolu 9.Kol. YS/PS  İnşaatı Nazlı İnşaat 11.09.2002
Dikmen, Mamak, Etimesgut, K.Ören, Etlik Muh. Sok.   PS / YS İnşaatı Bar-Fel İnşaat 10.09.2002
Y.Mahalle Yakacık Köyü Muh.  Sokaklar
PS İnşaatı
Gündüz İnşaat 22.05.2001
Kutugün Deresi Islahı Antalya İmar 16.08.2001
K.Ören, Etlik, Basınevler, Bademlik Muh. Sok. PS / YS  İnşaatı Metol İnşaat 12.09.2002
Haymana Yolu 6.Kol.  PS  İnşaatı Binko 17.07.2002
Çankaya Cebeci Mah. Muh. Sokaklar  PS / YS İsel 11.07.2002
Y.Mahalle, Şentepe II.Etap, I.Kısım Muh. Sokaklar  PS / YS Danışman İnşaat 15.04.1999
Sincan Fevzi Çakmak Mah.  PS/YS İnşaatı Öncü İnşaat 04.07.2002
Akpınar, Karapınar, Gökkuşağı ve Cevizlidere Mah.  PS / YS İnşaatı Kent İnşaat 05.09.2002

     2 - CONSULTANCY SERVICES for TCDD

WORK ADMINISTRATION CONTRACTOR TOTAL
Ankara-Esenkent-Eskişehir Demiryolu Hızlı Tren Proje ve Yapım Hizmeti işi TCDD Alarko OHL İspanya Ortak Girişimi 222 Km.
Ankara-İstanbul Hızlı Tren Projesi Esenkent-Sincan Arası Kontrollük ve Danışmanlık Hizmetleri TCDD SİGMA İNŞAT 48 Km

     3 – CONSULTANCY SERVICES for THE GREAT MUNICIPALITY OF ADANA

WORK ADMINISTRATION CONTRACTOR TOTAL
Adana Raylı Taşıma Sistemi, Kontrollük ve Müşavirlik Hizmet Alımı işi Adana B.Şehir Belediyesi Bombardiyar Transportation Alarko ABB Elektrik Konsorsiyum 13 Km.

     4 - CONSULTANCY SERVICES for BOTAŞ

WORK ADMINISTRATION CONTRACTOR TOTAL YEAR
İç Tesisat Doğalgaz Dönüşüm Projesi Botaş Boru Hatları ile Petrol Taşıma A.Ş. Simge Tekstil San.
Ltd. Şti.
1 Unit 2003-2003
İç Tesisat Doğalgaz Dönüşüm Projesi Botaş Boru Hatları ile Petrol Taşıma A.Ş. Bayramlar Dokuma San. ve Tic. A.Ş. 1 Unit 2003-2003
İç Tesisat Doğalgaz Dönüşüm Projesi Botaş Boru Hatları ile Petrol Taşıma A.Ş. Kotonteks Tekstil ve Gıda Ürünleri San ve Tic. A.Ş. 1 Unit 2003-2003
Tuz Gölü Yeraltı Doğal Gaz Depolama Projesi, Su Temin, Tuzlu Su Boşaltım Ve Doğal Gaz Boru Hatları İle Enerji Nakil Hatları Etüt, Harita ve Kamulaştırma Planları Müşavirlik Hizmetleri Botaş Boru Hatları ile Petrol Taşıma A.Ş Botaş Boru Hatları ile Petrol Taşıma A.Ş. 100 Km. 2006-